- Joined
- Sep 16, 2014
- Posts
- 218
- Reaction score
- 117
These pics show some of the components located in final positions. There is a lot of work that has gone into making this all line up correctly. Everyone involved has really done their best and I could not be happier with the results. At this point the piping will be the next major project to complete. I have a lot of mandrel bent pipes we have to cut, tig welded and mounted/supported from front to back. Once all that work is completed the piping, floor, hot side of turbos etc will be sent for heat treating at Jet Hot Coatings. Other parts will be painted and then the whole thing reassembled. I'm so ready to hear this V10 run again. There's 100s of small tasks to complete but at some point in 2022 I will line it up for an attempt at 275+ MPH. Looking forward to that!!!
You must be registered for see images attach
You must be registered for see images attach